A Rowan company - serving Cupertino, CA

ECO Window Systems Home Additions & ADU Nationwide

Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as $199/month*on approved credit; ask for current terms
Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

ECO Window Systems Home Additions & ADU: The Cupertino Owner’s Guide

We stock and install ECO Window Systems-compatible window and door assemblies for home additions and ADU projects in Cupertino, with typical installed pricing from $45,000 to $130,000 for full additions and $90,000 to $220,000 for detached ADUs. Most ECO Window Systems spec jobs in our Monta Vista and Rancho Rinconada projects move from signed scope to permit-ready in under two weeks. Homeowners usually discover a mismatch when their addition’s rough opening doesn’t align with the ECO Window Systems frame depth they ordered, or when thermal expansion in Cupertino’s 90-degree summer afternoons causes seal failure in south-facing units installed without expansion shim clearance.

Call (669) 202-9618

Which ECO Window Systems Models This Applies To

ECO Window Systems organizes its residential line into the ECO-100 (single-hung and slider), ECO-200 (double-hung and casement), and ECO-300 (fixed picture and architectural shapes) series. The critical compatibility gotcha for Cupertino additions and ADUs is frame depth: ECO-100 uses a 2-5/8 inch jamb depth, ECO-200 steps to 3-1/4 inches, and ECO-300 varies by custom order. We check the etched production label in the glass corner or the stamped aluminum tag on the sill track, never the homeowner’s original invoice, which often lists the marketing name rather than the fabrication spec.

OEM ECO Window Systems parts ship from their distribution center in Southern California with a 10-14 day lead time. For time-sensitive additions where the drywall crew is scheduled, we source equivalent-grade assemblies from our vetted aftermarket partners that match the thermal break spec (polyamide strip, not PVC thermal dam) and maintain the original U-factor rating. The aftermarket route saves roughly 15-20% on material cost and cuts lead time to 3-5 days, though we always disclose the manufacturer shift in writing before ordering. ECO Window Systems uses a proprietary corner-key fastening system on its vinyl line; aftermarket equivalents must replicate this exactly or the sash will rack within two seasons of Cupertino’s temperature swing cycle.

Signs Your ECO Window Systems Home Additions & ADU Is Failing

Two contractors installing wooden wall cabinets during a kitchen renovation project
Signs Your ECO Window Systems Home Additions & ADU Is Failing
  • Visible condensation between glass panes. The insulated glass unit (IGU) seal has failed, allowing moist Santa Clara Valley air to enter the airspace. In Cupertino’s dry summers this may seem to resolve, but the desiccant inside the spacer bar is already saturated; the fog returns with winter rains and the thermal performance is permanently degraded.
  • Sash won’t stay open or drifts closed. The balance system, either coil spring or block-and-tackle depending on series year, has lost tension. ECO Window Systems switched balance suppliers in 2019, so replacement requires identifying the stamped code on the balance shoe, not just the window size.
  • Air leakage at the meeting rail or frame perimeter. Compression weatherstrip has flattened or the pile fin seal has detached from its kerf slot. Cupertino’s UV exposure accelerates silicone bulb degradation; we see this first on west-facing additions in the Monta Vista hillside lots.
  • Cracking or chalking of exterior vinyl frame surfaces. Titanium dioxide loading in the vinyl cap stock has degraded after 12-15 years of California sun exposure. This is cosmetic until the substrate cracks compromise structural integrity, but it signals the window is past its reliable service life.
  • Hardware operates with grinding or the lock won’t engage. The zinc die-cast lock mechanism has corroded or the keeper has shifted due to frame expansion. On ECO-200 casement units, the multi-point locking system’s sequential adjustment is particular; a misadjusted top latch will stress the gearbox and strip the operator arm.
BeforeBefore
AfterAfter

Replacement Cost & What’s Included

Scope Cupertino Price Range
Single ECO Window Systems unit replacement (retrofit) $800 - $2,200
Full addition window package (6-10 units, ECO-200 series) $8,000 - $18,000
ADU window/door package with ECO-300 architectural units $12,000 - $28,000
Structural modification for altered rough opening $1,500 - $4,500 per opening
Permit, Title 24 compliance documentation, HERS verification $1,200 - $3,500

The range reflects three variables: unit size and series, whether the existing frame is retrofit-replaceable or requires full-frame removal with siding repair, and the condition of the surrounding substrate we find once the old unit is out. We price every job with a written scope that names the ECO Window Systems series or equivalent aftermarket spec, the installation method (insert vs. full-frame), and the exterior finish match. Under Clause 1 of the Haven Standard, that written price is delivered before any work starts. Our 365-Day Done Right Promise covers the installation, the flashing integration, and the interior trim return. No change to the scope proceeds without a signed change order, which is why our projects finish within a few percent of the number we quoted.

DIY or Call Us?

Worker applying mortar to kitchen wall for tile backsplash installation
DIY or Call Us?

An owner can safely verify the model series from the glass etch or sill stamp, measure the rough opening width and height at three points each, and photograph any water staining on the surrounding drywall. What goes wrong past that point is usually the flashing integration: ECO Window Systems units require a sloped sill pan (sill pan, the formed membrane that directs water to the exterior) with end dams sealed to the rough opening, and Cupertino’s intermittent winter driving rain will find any gap in that sequence.

Full-frame replacement on a second-story addition involves ladder work with a unit that weighs 80-150 pounds depending on size. The safety caveat is straightforward: the risk isn’t the window, it’s the fall. We carry the unit, integrate the flashing, and provide the documented photo record of every layer before trim covers it. Call (669) 202-9618 to schedule your free estimate; we’ll review your ECO Window Systems labels, measure the openings, and deliver a written price you can compare against any other quote.

Get the price in writing before anything starts.A real person answers, day or night.
Call now

FAQs

Need Construction help in Cupertino? Licensed & insured · Free written quotes response · free estimates
Call (669) 202-9618
Local Service Coverage

Request a Free Estimate in Cupertino

Tell us what you need - Rowan Construction Group Cupertino responds fast. No obligation.

By requesting your free estimate, you confirm you have read our Privacy Policy and agree that you may be contacted by call, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch